Bayswater-Bassendean Path commenced!

User avatar
gclark8
Posts: 959
Joined: Sat May 14, 2011 7:09 am
Location: Bassendean, WA

Bayswater-Bassendean Path commenced!

Postby gclark8 » Sat Nov 12, 2011 12:32 pm

Yes the new path along the railway line from Tonkin Hwy in Bayswater to Collier Road in Bassendean has commenced! :shock:
Cheers,
George.

fixed
Posts: 840
Joined: Thu Feb 26, 2009 1:16 pm

Re: Bayswater-Bassendean Path commenced!

Postby fixed » Sun Nov 13, 2011 3:48 pm

Every little bit helps.
The bicycle is a curious vehicle. Its passenger is its engine.

User avatar
wagr1213
Posts: 128
Joined: Sun Mar 28, 2010 1:24 pm
Location: Beechboro

Re: Bayswater-Bassendean Path commenced!

Postby wagr1213 » Mon Nov 14, 2011 2:53 pm

Yes Posted this on Tues in the PSP sticky section

PSP-Cyclists critique of the infrastructure
by wagr1213 » Tue Nov 08, 2011 11:58 pm

Work commenced today on construction of the extension of the PSP from Tonkin Hwy to Bassendean Station.

Im told that the route will swing away from where it currently becomes a section of grey black bitumen following the existing parallelling of the railway closer to the rail reserve down to the Kattaning st xing lights - after xing the intersection it will continue down the Guildford rd side of the rail corridor to the Collier rd crossing which has existing upgraded pedestrian/cycleway gates to enable changing to the western side of the railway.

Machines spent today cutting a route east through the grasses towards Ashfield station on the Guildford rd side.

Not before time!
Malvern Star Oppy A4 Operator
Image

User avatar
gclark8
Posts: 959
Joined: Sat May 14, 2011 7:09 am
Location: Bassendean, WA

Re: Bayswater-Bassendean Path commenced!

Postby gclark8 » Mon Nov 14, 2011 6:36 pm

Some Pix: From Ashfield Staton:
Image
Image

Bayswater end:
Image
Image
Image
Last edited by Mulger bill on Tue Nov 15, 2011 10:23 pm, edited 1 time in total.
Reason: Images fixed
Cheers,
George.

User avatar
jet-ski
Posts: 1404
Joined: Thu Dec 06, 2007 5:51 pm
Location: Perth WA
Contact:

Re: Bayswater-Bassendean Path commenced!

Postby jet-ski » Mon Nov 14, 2011 7:12 pm

Yeah, not that impressed til it gets to Midland. The road route from Bayswater - Bassendean isn't the worst - it's once you get past Bassendean where things get more difficult.
Bike Friday New World Tourist, Schwinn Le Tour Sport, Giant TCR, Giant STP2, 9:zero:7 fattie

R12RT
Posts: 478
Joined: Sat Jun 21, 2008 9:47 am
Location: Ballajura, Western Australia

Re: Bayswater-Bassendean Path commenced!

Postby R12RT » Mon Nov 14, 2011 8:23 pm

What theory are going to do to make crossing Katanning St and Collier Rd will be interesting. These are very busy intersections.

I would have to agree that this stretch is less of a problem than Bassendean to Midland.
John Beaven
2010 Malvern Star Oppy C6
2014 Giant Propel Advanced 1

User avatar
gclark8
Posts: 959
Joined: Sat May 14, 2011 7:09 am
Location: Bassendean, WA

Re: Bayswater-Bassendean Path commenced!

Postby gclark8 » Tue Nov 15, 2011 1:55 am

R12RT wrote:What theory are going to do to make crossing Katanning St and Collier Rd will be interesting. These are very busy intersections.
The Crossings will be the same as Caledonian Ave Maylands.
Edit: check www.nearmap.com for an aerial view.
Last edited by gclark8 on Tue Nov 15, 2011 12:42 pm, edited 1 time in total.
Cheers,
George.

R12RT
Posts: 478
Joined: Sat Jun 21, 2008 9:47 am
Location: Ballajura, Western Australia

Re: Bayswater-Bassendean Path commenced!

Postby R12RT » Tue Nov 15, 2011 9:40 am

gclark8 wrote:
R12RT wrote:What theory are going to do to make crossing Katanning St and Collier Rd will be interesting. These are very busy intersections.
The Crossings will be the same as Caledonian Ave Maylands.
That is what I would have expected.

Although I am unsure what else could be done, these are going to be very dangerous intersections as they will be a lot busier than Caledonian Ave.
John Beaven
2010 Malvern Star Oppy C6
2014 Giant Propel Advanced 1

fixed
Posts: 840
Joined: Thu Feb 26, 2009 1:16 pm

Re: Bayswater-Bassendean Path commenced!

Postby fixed » Tue Nov 15, 2011 2:47 pm

My understanding is the bike path will head north at Collier Rd and then head east to Basso station along Baltic Court, Prospector Loop and Railway Parade.
Crossing Lord is going to be a stumbling point. The PSP should go under Lord St and via Success Hill Station go over the river along the rail line. At the rate the PSP is getting further east, I will be an old man before it reaches Midland.
The bicycle is a curious vehicle. Its passenger is its engine.

User avatar
gclark8
Posts: 959
Joined: Sat May 14, 2011 7:09 am
Location: Bassendean, WA

Re: Bayswater-Bassendean Path commenced!

Postby gclark8 » Tue Nov 15, 2011 4:19 pm

I understand Collier Road (Iolanthe St) Crossing to the Guildford Bridge is the next section. Maybe Jim can pop up and give us the latest. :)
Cheers,
George.

User avatar
wagr1213
Posts: 128
Joined: Sun Mar 28, 2010 1:24 pm
Location: Beechboro

Re: Bayswater-Bassendean Path commenced!

Postby wagr1213 » Thu Dec 22, 2011 1:23 am

R12RT wrote:
gclark8 wrote:
R12RT wrote:What theory are going to do to make crossing Katanning St and Collier Rd will be interesting. These are very busy intersections.
The Crossings will be the same as Caledonian Ave Maylands.
That is what I would have expected.

Although I am unsure what else could be done, these are going to be very dangerous intersections as they will be a lot busier than Caledonian Ave.

Well the PTA required fencework, Gates and associated culvert work is almost finished along this section now so at least some progress is being made.

Regarding the crossings - the same style of PSP crossing as the Caledonian Av arrangement has been employed at Hamilton Rd & Wharf St crossings on the Armadale line PSP
Both of these crossings are quite busy ( possibly much busier than Caledonian Av) and they seem to be working ok, though it has taken a little time for the tin box brigade to adapt to the need to keep the clearway "Clear" but it is improving - You will of course always get the occassional ignoramous that is totally oblivious to the clearway requirements who will block the path. :evil:
Not sure why similar requirements havnt been put in place at the Welshpool Rd crossing :? Now there is a crossing which is dangerous to traverse.

As with Caledonian Av, the onus is still on the Cyclist to give way to traffic movements when the flow of traffic is being controlled by the traffic lights, but when the gates are down, it should be just as sweet crossing Collier Rd and Kattanning St, as it is at Caledonian Av, Hamilton Rd & Wharf St :) and lets face it - I think we all try to be travelling thru the crossings when there is a train setting off the gates. 8)
Malvern Star Oppy A4 Operator
Image

dampier
Posts: 119
Joined: Sat Jan 16, 2010 12:35 am

Re: Bayswater-Bassendean Path commenced!

Postby dampier » Fri Feb 10, 2012 1:51 pm

Hi,
I went to Midland the other day and thought that there would be some visible progress on the path. Does anyone know when it will be started / finished?

troyww
Posts: 86
Joined: Tue Jun 28, 2011 12:12 pm

Re: Bayswater-Bassendean Path commenced!

Postby troyww » Sat Feb 11, 2012 3:36 pm

Riding to a mates place in Basso this afternoon from bayswater , It's an easy ride along the river but hopefully they continue it . I'd love for the path to go all the way up greenmount hill . Somewhere safe to go hillclimbing would be awesome .

User avatar
CycleSnail
Posts: 559
Joined: Thu Feb 26, 2009 1:23 pm
Location: Bassendean, WA
Contact:

Re: Bayswater-Bassendean Path commenced!

Postby CycleSnail » Mon Feb 13, 2012 7:04 pm

dampier wrote:Hi,
I went to Midland the other day and thought that there would be some visible progress on the path. Does anyone know when it will be started / finished?
"This financial year" is the answer I was given. A good time for the minister would be to open it during bike week, but that is clearly not going to happen at the rate they are progressing.
Support high quality cycling advocacy!

User avatar
Aushiker
Posts: 22396
Joined: Tue Jun 05, 2007 1:55 pm
Location: Walyalup land
Contact:

Re: Bayswater-Bassendean Path commenced!

Postby Aushiker » Wed Feb 29, 2012 12:34 pm

More information at the BTA on the Bassendean Station to Lord Street section.

Andrew

User avatar
wagr1213
Posts: 128
Joined: Sun Mar 28, 2010 1:24 pm
Location: Beechboro

Re: Bayswater-Bassendean Path commenced!

Postby wagr1213 » Wed Mar 14, 2012 11:39 pm

After the dust had settled with the repositioning of fences, Today work commenced with graders and diggers etc to start carving the path route from Basso thru to the Katanning st Xing :D
Malvern Star Oppy A4 Operator
Image

troyww
Posts: 86
Joined: Tue Jun 28, 2011 12:12 pm

Re: Bayswater-Bassendean Path commenced!

Postby troyww » Mon Apr 30, 2012 4:24 pm

Been driving past this once a week and it's really been moving along . Looks like it will be finished in about a month , but I'm no civil engineer .

J Quinton
Posts: 237
Joined: Fri Jan 06, 2012 7:52 pm

Re: Bayswater-Bassendean Path commenced!

Postby J Quinton » Mon Apr 30, 2012 9:17 pm

They need to fix the boards on the guildford bridge asap.

wexford
Posts: 275
Joined: Mon Mar 14, 2011 7:26 pm
Location: Perth, Western Australia

Re: Bayswater-Bassendean Path commenced!

Postby wexford » Mon Apr 30, 2012 10:41 pm

I did the Swan Railway Heritage Trail (MTB) last week and was riding back to the CBD along the railway and couldn't resist having a go along here.

It was deep soft sand, I lasted about 10 metres. Some MTBer :shock:

User avatar
Red Rider
Posts: 1024
Joined: Sun Jan 23, 2011 5:44 pm
Location: Perth

Re: Bayswater-Bassendean Path commenced!

Postby Red Rider » Fri May 18, 2012 10:59 am

The path base looks to be good to go, they have prepared the join between old and new, the hotmix should be going on soon :)
Image
Click to view full-sized image!

Gnor
Posts: 11
Joined: Sat Apr 07, 2012 2:55 am

Re: Bayswater-Bassendean Path commenced!

Postby Gnor » Sun May 20, 2012 3:32 am

Black stuff went down Friday arvo...hoping for some riding along there soon!

User avatar
CycleSnail
Posts: 559
Joined: Thu Feb 26, 2009 1:23 pm
Location: Bassendean, WA
Contact:

Re: Bayswater-Bassendean Path commenced!

Postby CycleSnail » Sun May 20, 2012 9:39 am

The sticky stuff is rideable, but bumpy. We are just about there!

http://a1.sphotos.ak.fbcdn.net/hphotos- ... 2942_n.jpg

Image
Support high quality cycling advocacy!

User avatar
hiflange
Posts: 1938
Joined: Tue May 05, 2009 9:27 pm
Location: Perth
Contact:

Re: Bayswater-Bassendean Path commenced!

Postby hiflange » Sun May 20, 2012 9:50 am

Drove along Guildford Road yesterday, the path looks so good! The bridge into Guildford itself has quite a way to go though :(

User avatar
CycleSnail
Posts: 559
Joined: Thu Feb 26, 2009 1:23 pm
Location: Bassendean, WA
Contact:

Re: Bayswater-Bassendean Path commenced!

Postby CycleSnail » Sun May 20, 2012 10:28 am

RobertFrith wrote:Drove along Guildford Road yesterday, the path looks so good! The bridge into Guildford itself has quite a way to go though :(
The upstream footpath is going to get a concrete deck instead of the rough timber. It will then become the "temporary" PSP route to Midland.
Support high quality cycling advocacy!

User avatar
Red Rider
Posts: 1024
Joined: Sun Jan 23, 2011 5:44 pm
Location: Perth

Re: Bayswater-Bassendean Path commenced!

Postby Red Rider » Sun May 20, 2012 4:21 pm

Someone has been giving them the rev-up, I've seen them working Saturdays to get it done 'in time'.
The path is looking like it'll turn out to be a beauty, well prepared, wide.