Riders down PSP fork south of Warwick Station
-
- Posts: 1808
- Joined: Tue Sep 01, 2009 12:21 am
- Location: Perth, Western Australia
- Contact:
Riders down PSP fork south of Warwick Station
Postby eldavo » Mon Apr 16, 2012 10:17 pm
http://www.nearmap.com/?q=Riders%20Down ... d=20111217
Cold reminder how a hairy intersection in good weather and vision of daylight can bite quickly with poorer vision at night.
OT: By poorer vision I also mean tonight's reminder the non-dipping disorentation dazzle of MTB offroad design lithium powered LED lights very affordable now continuing this http://lightmare.org/
I've only found this German spec reflector LED so far to address it...
http://reviews.mtbr.com/philips-saferid ... s-shootout
...but would mean getting everyone else to use it too, and still dip/twist/dim etc. the spotlight or helmet light...
- rolandp
- Posts: 2316
- Joined: Fri Mar 14, 2008 11:47 am
- Location: Hillarys - Perth, WA
Re: Riders down PSP fork south of Warwick Station
Postby rolandp » Mon Apr 16, 2012 11:44 pm
-
- Posts: 1808
- Joined: Tue Sep 01, 2009 12:21 am
- Location: Perth, Western Australia
- Contact:
Re: Riders down PSP fork south of Warwick Station
Postby eldavo » Tue Apr 17, 2012 12:28 am
Reminder to self to take it easier around all the intersections.
- rolandp
- Posts: 2316
- Joined: Fri Mar 14, 2008 11:47 am
- Location: Hillarys - Perth, WA
Re: Riders down PSP fork south of Warwick Station
Postby rolandp » Tue Apr 17, 2012 1:17 am
For example
Run No: 520
Date: 16/04/12
Hare: Mankini
Location: Monyash Reserve, Carine
Directions: North on Mitchell, left on Reid Hwy, 1st right on Duffy Rd, near the end, turn into carpark on south side of the club rooms.
Always slow down for that corner as it is a dog leg.
-
- Posts: 1808
- Joined: Tue Sep 01, 2009 12:21 am
- Location: Perth, Western Australia
- Contact:
Re: Riders down PSP fork south of Warwick Station
Postby eldavo » Tue Apr 17, 2012 2:32 am
PS: I noticed the fencing going up along the path closer to Warwick Station from the dogleg with cheese grater edge is at ~1.8m normal house fence height versus the Karrinyup Rd. section.
They also didn't leave the concrete based poles at side of path for 2 weeks either and path with sections of sand to washout at fastest point at valley of the hill like Karrinyup has now.
- rolandp
- Posts: 2316
- Joined: Fri Mar 14, 2008 11:47 am
- Location: Hillarys - Perth, WA
Re: Riders down PSP fork south of Warwick Station
Postby rolandp » Tue Apr 17, 2012 8:20 am
However, it doesn't help when they put up arrows on the incorrect side of the path, as well as a turn point. Below images captured last night near Powis St.
-
- Posts: 1808
- Joined: Tue Sep 01, 2009 12:21 am
- Location: Perth, Western Australia
- Contact:
Re: Riders down PSP fork south of Warwick Station
Postby eldavo » Tue Apr 17, 2012 10:50 am
- Aushiker
- Posts: 22396
- Joined: Tue Jun 05, 2007 1:55 pm
- Location: Walyalup land
- Contact:
Re: Riders down PSP fork south of Warwick Station
Postby Aushiker » Tue Apr 17, 2012 2:13 pm
+ 1 Have been forced into the dirt when heading south by a couple of northbound cyclists who felt riding at speed and cutting the corner there was smartrolandp wrote:Not good news, hate that corner as there are no lights on that no name park (it is not carine open space). Do you have more details as I went through around 6:30pm.
Hope the rider recovers quickly.
Andrew
Aushiker.com
- rolandp
- Posts: 2316
- Joined: Fri Mar 14, 2008 11:47 am
- Location: Hillarys - Perth, WA
Re: Riders down PSP fork south of Warwick Station
Postby rolandp » Tue Apr 17, 2012 10:16 pm
Didn't notice it on the way home last night, but then again it was dark, there are no lights in the area, and I was riding on the side which was clear.
Cleaned it up as best as I could, and reported the area/issue to the City of Stirling. The first photo you can see that dog-leg of a bend, and the main PSP continues to the left, not the one going straight on.
Whist speaking about this area, still waiting for the direction sign to be corrected, reported by NeatStreets Jan-2012.
Hope the rider has a quick recovery.
-
- Posts: 1808
- Joined: Tue Sep 01, 2009 12:21 am
- Location: Perth, Western Australia
- Contact:
Re: Riders down PSP fork south of Warwick Station
Postby eldavo » Tue Apr 17, 2012 11:02 pm
- rolandp
- Posts: 2316
- Joined: Fri Mar 14, 2008 11:47 am
- Location: Hillarys - Perth, WA
Re: Riders down PSP fork south of Warwick Station
Postby rolandp » Tue Apr 17, 2012 11:22 pm
Local kids building a cubby, there was an other crate up the tree.eldavo wrote:What was the story with the banana leaves and crate/board near that tree?
- rolandp
- Posts: 2316
- Joined: Fri Mar 14, 2008 11:47 am
- Location: Hillarys - Perth, WA
Re: Riders down PSP fork south of Warwick Station
Postby rolandp » Tue Apr 24, 2012 11:18 pm
Haven't heard back from the City of Stirling, will send them a follow up e-mail including one of these images as a reminder.
- rolandp
- Posts: 2316
- Joined: Fri Mar 14, 2008 11:47 am
- Location: Hillarys - Perth, WA
Re: Riders down PSP fork south of Warwick Station
Postby rolandp » Tue Jun 03, 2014 10:46 pm
There are several grass trees re-located to the park area.
Hopefully this is to remove that poor join/corner from the PSP to the 'shared path', and to continue over Excalibur Way.
-
- Posts: 450
- Joined: Mon May 25, 2009 7:40 pm
Re: Riders down PSP fork south of Warwick Station
Postby citywomble » Wed Jun 04, 2014 12:55 am
I can advise that works are due to commence this week to provide an effective and much improved solution.
A joint project, between the City of Stirling and Main Roads WA, will see the PSP reconstructed, between the pedestrian footbridge over the freeway and Excalibur Way, close to the freeway fence which is why some vegetation and trees are being removed, while a new replacement parallel path will be constructed within the grassed area of the park. A landscaping buffer will be between.
Whilst still within the park, this will separate the fast PSP from the pedestrians and children in the park and remove the unsafe Y Intersection.
Diversions will be in place until 20 June 2014, while the works are underway. See:
https://www.mainroads.wa.gov.au/UsingRo ... 43fz9oaySM
- rolandp
- Posts: 2316
- Joined: Fri Mar 14, 2008 11:47 am
- Location: Hillarys - Perth, WA
Re: Riders down PSP fork south of Warwick Station
Postby rolandp » Wed Jun 04, 2014 8:20 am
Will this also include installing cycle lanes on Excalibur Way? There are a number of cyclists who exit the PSP, who through their own choice, fail to slow down. Excalibur Way is not a very busy street, and my estimates are around 99% of the time I don't see a moving motorists vehicle on it. It is that 1% when you do, and I get that 'brown trouser feeling' when I observe cyclists exiting off the PSP onto the road, in particular the northern end. Ironically, I'm that 'vehicle' as I don't use the northern section of the PSP as I feel it is too narrow, and get onto the PSP at Excalibur Way, so I weekly see cyclists exiting the PSP onto Excalibur Way and they have not noticed me or think it is 'OK' to exit. By installing cycle lanes on Excalibur Way, there is that visual barrier between the PSP and the road.
In addition, as this is a modification to the PSP, will Main Roads be installed overhead lights, as from Karrinyup Rd all the way pass this point, there is no overhead lights. Given that this section is being modified, as well as further south at Gribble Rd, hopefully lighting will be installed as part of these improvements.
- Aushiker
- Posts: 22396
- Joined: Tue Jun 05, 2007 1:55 pm
- Location: Walyalup land
- Contact:
Re: Riders down PSP fork south of Warwick Station
Postby Aushiker » Wed Jun 04, 2014 9:43 am
I do echo Roland's comments as well and assume that Main Roads will apply its own guidelines in respect to lighting.
Andrew
Aushiker.com
-
- Posts: 298
- Joined: Wed Nov 20, 2013 9:17 pm
Re: Riders down PSP fork south of Warwick Station
Postby worzel » Wed Jun 04, 2014 10:43 am
Any chance they can cut down the taller trees that the Kamikazee magpies lurk in while they are at it (still got a damaged shoulder 6 months after being attacked near there)citywomble wrote:I can advise that works are due to commence this week to provide an effective and much improved solution.
- rolandp
- Posts: 2316
- Joined: Fri Mar 14, 2008 11:47 am
- Location: Hillarys - Perth, WA
Re: Riders down PSP fork south of Warwick Station
Postby rolandp » Wed Jun 04, 2014 10:02 pm
Mitchell Freeway Principal Shared Path (PSP) - Exaclibur Way, Carine
Ongoing to 20 June 2014
The City of Stirling are completing works on the PSP near Exaclibur Way, Carine. The path will be closed between the hours of 7.00 am to 5.00 pm, with detours in place.
Not a big issue, and seeing roads that I haven't seen before.
- Mububban
- Posts: 3065
- Joined: Wed Feb 20, 2008 12:19 pm
Re: Riders down PSP fork south of Warwick Station
Postby Mububban » Thu Jun 05, 2014 9:55 am
- rolandp
- Posts: 2316
- Joined: Fri Mar 14, 2008 11:47 am
- Location: Hillarys - Perth, WA
Re: Riders down PSP fork south of Warwick Station
Postby rolandp » Thu Jun 05, 2014 11:10 pm
It didn't help that this was installed on the entrance to the PSP at the south end:
My route around this diversion is (when travelling south):
PSP off at Excalibur Way - turn right
First turn left - Tresise St
Follow Tresise St until the end (intersection of Camelot St) - turn left
Look out for the 'Shared Path Closed' sign - ignore, as this is your entrance back onto the PSP
-
- Posts: 298
- Joined: Wed Nov 20, 2013 9:17 pm
Re: Riders down PSP fork south of Warwick Station
Postby worzel » Fri Jun 06, 2014 10:27 am
I wish I had seen this post before I left home at 6am this morning as I did exactly the same thing and there were others lost too. So much for only being closed from 7am - it was closed at 6.30 and looked like it was a 24 hour a day closure. Then there are signs telling you to divert away from the PSP but nothing to tell you how to get back on it. I tried several side roads until going down Camelot St (got caught out by a fast left hander and almost lost it) to a dead end. It was only when retracing my route I saw the "Share Path Closed sign" and in desperation rode down that way to look for clues, and this sign was ironically where to rejoin the path (with a hairpin right turn).rolandp wrote:Got lost on my trip in this morning (travelling South). I wasn't the only one.
It didn't help that this was installed on the entrance to the PSP at the south end:
My route around this diversion is (when travelling south):
PSP off at Excalibur Way - turn right
First turn left - Tresise St
Follow Tresise St until the end (intersection of Camelot St) - turn left
Look out for the 'Shared Path Closed' sign - ignore, as this is your entrance back onto the PSP
- CXCommuter
- Posts: 1885
- Joined: Thu Feb 14, 2013 12:18 pm
- Location: Lane Cove NSW
Re: Riders down PSP fork south of Warwick Station
Postby CXCommuter » Fri Jun 06, 2014 10:38 am
-
- Posts: 1791
- Joined: Wed Mar 02, 2011 1:25 pm
Re: Riders down PSP fork south of Warwick Station
Postby wellington_street » Fri Jun 06, 2014 1:57 pm
- CXCommuter
- Posts: 1885
- Joined: Thu Feb 14, 2013 12:18 pm
- Location: Lane Cove NSW
Re: Riders down PSP fork south of Warwick Station
Postby CXCommuter » Fri Jun 06, 2014 2:44 pm
From what I saw last night the left turn off the PSP is still open so you can access the overpass and Guinevere Street.wellington_street wrote:More quality WA traffic management
Is this connection via Guinevere Street still open?
- CXCommuter
- Posts: 1885
- Joined: Thu Feb 14, 2013 12:18 pm
- Location: Lane Cove NSW
Re: Riders down PSP fork south of Warwick Station
Postby CXCommuter » Mon Jun 16, 2014 8:14 am
Above statement retracted, on Friday the PSP was blocked back at the top of the hill at the diversion exit.CXCommuter wrote:From what I saw last night the left turn off the PSP is still open so you can access the overpass and Guinevere Street.wellington_street wrote:More quality WA traffic management
Is this connection via Guinevere Street still open?
- General Australian Cycling Topics
- Info / announcements
- Buying a bike / parts
- General Cycling Discussion
- The Bike Shed
- Cycling Health
- Cycling Safety and Advocacy
- Women's Cycling
- Bike & Gear Reviews
- Cycling Trade
- Stolen Bikes
- Bicycle FAQs
- The Market Place
- Member to Member Bike and Gear Sales
- Want to Buy, Group Buy, Swap
- My Bikes or Gear Elsewhere
- Serious Biking
- Audax / Randonneuring
- Retro biking
- Commuting
- MTB
- Recumbents
- Fixed Gear/ Single Speed
- Track
- Electric Bicycles
- Cyclocross and Gravel Grinding
- Dragsters / Lowriders / Cruisers
- Children's Bikes
- Cargo Bikes and Utility Cycling
- Road Racing
- Road Biking
- Training
- Time Trial
- Triathlon
- International and National Tours and Events
- Cycle Touring
- Touring Australia
- Touring Overseas
- Touring Bikes and Equipment
- Australia
- Western Australia
- New South Wales
- Queensland
- South Australia
- Victoria
- ACT
- Tasmania
- Northern Territory
- Country & Regional
Who is online
Users browsing this forum: No registered users
- All times are UTC+10:00
- Top
- Delete cookies
About the Australian Cycling Forums
The Australian Cycling Forums is a welcoming community where you can ask questions and talk about the type of bikes and cycling topics you like.
Bicycles Network Australia
Forum Information
Connect with BNA
This website uses affiliate links to retail platforms including ebay, amazon, proviz and ribble.