Postby Mububban » Wed Sep 10, 2014 10:35 pm
- Mububban
- Posts: 3065
- Joined: Wed Feb 20, 2008 12:19 pm
Re: Mitchell Fway PSP - Gribble Rd, Gwelup bypass
Postby Mububban » Mon Sep 15, 2014 4:40 pm
-
- Posts: 102
- Joined: Fri May 27, 2011 10:29 pm
- Location: Perth, WA
Re: Mitchell Fway PSP - Gribble Rd, Gwelup bypass
Postby as7431 » Mon Sep 15, 2014 4:51 pm
Hopefully not far away now
Tim
- CXCommuter
- Posts: 1885
- Joined: Thu Feb 14, 2013 12:18 pm
- Location: Lane Cove NSW
Re: Mitchell Fway PSP - Gribble Rd, Gwelup bypass
Postby CXCommuter » Tue Sep 16, 2014 8:27 am
It appears this is the main section of lights to be installed -most if not all appear in place along the new section.as7431 wrote:Road past on Sat arvo and saw the markings for lights along the old stretch of the path (closer to Reid Hwy underpass). Each one was numbered and the numbered ended at 70. That's a lot of lights
Hopefully not far away now
Tim
- CycleSnail
- Posts: 559
- Joined: Thu Feb 26, 2009 1:23 pm
- Location: Bassendean, WA
- Contact:
Re: Mitchell Fway PSP - Gribble Rd, Gwelup bypass
Postby CycleSnail » Wed Sep 17, 2014 7:08 pm
‘The delay in raising the property fence heights came about almost at the end of the construction due to residents contacting the Local Member and a subsequent site meeting with all.
A number of residents complained about the existing freeway verge being about 1 metre above the level of their back yards (hence reducing the effectiveness of the height of their existing fences) – this was a pre-existing situation caused by the 7 year old development construction “benching” into the road reserve. As Vince advises we agreed to install a row of limestone blocks along part of the fence line to overcome this. While the new PSP has only added a minimal amount to the height behind these properties, it would be clear that the privacy and security of these properties is compromised at present. The Contractor has been liaising with City of Stirling to obtain the required approvals, and while not yet finalised it is close. The Contractor also has approval from the relevant property owners for this work to be done.
This work along with the lighting teams require trade utes/vehicles to be present along the path, otherwise workers would have to walk long distances to access materials and tools ie the delay in opening would be much longer. While we are very aware of the desire of the cycling fraternity to be allowed onto this PSP, we are also aware of an obligation we have to the local residents to ensure their privacy and security is maintained. MRWA are working closely with the Contractor to ensure the fence works are completed so that this project can be handed over the pedestrians and cyclists.
Yes there has been some days when work has not been consistent along the path, but to open one day and closed the next to open the next etc would create even more complaints and look even more inappropriate. Also OH&S Laws do not permit such mixing of work and path users.
- rolandp
- Posts: 2316
- Joined: Fri Mar 14, 2008 11:47 am
- Location: Hillarys - Perth, WA
Re: Mitchell Fway PSP - Gribble Rd, Gwelup bypass
Postby rolandp » Thu Sep 18, 2014 8:02 am
We are all keen to see the opening of the new section of path along the Mitchell Freeway between Erindale and Balcatta Roads. Main Roads Western Australia advise that work is almost finished with minor lighting and fencing yet to be completed. Stand by! #notlongnow #llovetheride
Wonder which group is getting the correct information?
In my opinion, a '7 year old development construction "breaching" into the road reserve' should have been resolved 6.75 years ago.
-
- Posts: 588
- Joined: Mon Sep 19, 2011 1:13 am
- Location: Perth, NOR
Re: Mitchell Fway PSP - Gribble Rd, Gwelup bypass
Postby dmwill » Thu Sep 18, 2014 2:52 pm
-
- Posts: 524
- Joined: Thu Feb 12, 2009 5:45 pm
Re: Mitchell Fway PSP - Gribble Rd, Gwelup bypass
Postby redned » Thu Sep 18, 2014 4:53 pm
So does this mean that when these residents built their houses, they benched into the road reserve, and now a legitimate use is made of the road reserve its someone else's responsibility to fix it up?CycleSnail wrote:....the existing freeway verge being about 1 metre above the level of their back yards (hence reducing the effectiveness of the height of their existing fences) – this was a pre-existing situation caused by the 7 year old development construction “benching” into the road reserve. ...
-
- Posts: 102
- Joined: Fri May 27, 2011 10:29 pm
- Location: Perth, WA
Re: Mitchell Fway PSP - Gribble Rd, Gwelup bypass
Postby as7431 » Thu Sep 18, 2014 9:25 pm
Seems no one had the "you know what's" to take on the developer at the time of them stealing the land and so now it is up to the tax payer to fix the problem. I wonder if there is a statute of limitations on such things. If there is, perhaps I can just move my fence a bit and take the extra (council owned) land next to my property. Then after a numeber of years, it becomes mineredned wrote:So does this mean that when these residents built their houses, they benched into the road reserve, and now a legitimate use is made of the road reserve its someone else's responsibility to fix it up?CycleSnail wrote:....the existing freeway verge being about 1 metre above the level of their back yards (hence reducing the effectiveness of the height of their existing fences) – this was a pre-existing situation caused by the 7 year old development construction “benching” into the road reserve. ...
-
- Posts: 450
- Joined: Mon May 25, 2009 7:40 pm
Re: Mitchell Fway PSP - Gribble Rd, Gwelup bypass
Postby citywomble » Thu Sep 18, 2014 10:02 pm
What it does mean is that when the plot was levelled it was levelled to the boundary leaving a small step at the boundary.
The problem is that this has now been compounded by building a path, with public access, very close to the boundary and actually elevating the path above the existing ground level. The combination of public access and the raised path are what has adversely affected the adjacent properties and necessitated the refencing.
-
- Posts: 102
- Joined: Fri May 27, 2011 10:29 pm
- Location: Perth, WA
Re: Mitchell Fway PSP - Gribble Rd, Gwelup bypass
Postby as7431 » Thu Sep 18, 2014 11:51 pm
-
- Posts: 55
- Joined: Sun Jul 06, 2014 10:41 am
Re: Mitchell Fway PSP - Gribble Rd, Gwelup bypass
Postby BaldPatch » Sat Sep 20, 2014 6:34 am
- Mububban
- Posts: 3065
- Joined: Wed Feb 20, 2008 12:19 pm
Re: Mitchell Fway PSP - Gribble Rd, Gwelup bypass
Postby Mububban » Sat Sep 20, 2014 4:26 pm
I do like that quote "you are not stuck IN traffic - you ARE the traffic"BaldPatch wrote:Im sure some of the traffic victims sitting in their little road rage cages will be outraged when they look out their windows and see all that expensive cycling infrastructure.
- CXCommuter
- Posts: 1885
- Joined: Thu Feb 14, 2013 12:18 pm
- Location: Lane Cove NSW
Re: Mitchell Fway PSP - Gribble Rd, Gwelup bypass
Postby CXCommuter » Fri Sep 26, 2014 2:41 pm
-
- Posts: 1808
- Joined: Tue Sep 01, 2009 12:21 am
- Location: Perth, Western Australia
- Contact:
Re: Mitchell Fway PSP - Gribble Rd, Gwelup bypass
Postby eldavo » Tue Sep 30, 2014 2:01 pm
-
- Posts: 13
- Joined: Mon May 05, 2014 4:30 pm
Re: Mitchell Fway PSP - Gribble Rd, Gwelup bypass
Postby BMac » Tue Sep 30, 2014 2:21 pm
Should set a good Strava time!eldavo wrote:I suppose jumping on the freeway in peak traffic to travel Erindale to Reid Highway is one way to view the progress this afternoon, maybe even put the bike on roof rack and wear helmet in the car, windows down, bottle holders on the dash, spitting out energy gel tearoffs while shouting abuse at wheel suckers motioning them to pass, mongrels
-
- Posts: 1808
- Joined: Tue Sep 01, 2009 12:21 am
- Location: Perth, Western Australia
- Contact:
Re: Mitchell Fway PSP - Gribble Rd, Gwelup bypass
Postby eldavo » Tue Sep 30, 2014 2:25 pm
- CXCommuter
- Posts: 1885
- Joined: Thu Feb 14, 2013 12:18 pm
- Location: Lane Cove NSW
Re: Mitchell Fway PSP - Gribble Rd, Gwelup bypass
Postby CXCommuter » Thu Oct 16, 2014 1:18 pm
- Thoglette
- Posts: 6621
- Joined: Thu Feb 19, 2009 1:01 pm
Re: Mitchell Fway PSP - Gribble Rd, Gwelup bypass
Postby Thoglette » Thu Oct 16, 2014 6:46 pm
It's not the work that takes the time, it's getting QA sign off on the paperwork afterwards.CXCommuter wrote:Still waiting for the opening time- how long does it take to install fences
Can't take the fences down until the certificate of completion is issued.
"People are worthy of respect, ideas are not." Peter Ellerton, UQ
- rolandp
- Posts: 2316
- Joined: Fri Mar 14, 2008 11:47 am
- Location: Hillarys - Perth, WA
Re: Mitchell Fway PSP - Gribble Rd, Gwelup bypass
Postby rolandp » Thu Oct 16, 2014 10:43 pm
The new estate in this area was started developing after the PSP development, and these lots are now available to purchase. This including earth works, retaining walls, roads, paths, water, gas, electricity, phones, etc.
It should not take this long to build this PSP, or get what ever approval/set back through.
It will be interesting to see how long the new Hway overpass takes to build.
-
- Posts: 1791
- Joined: Wed Mar 02, 2011 1:25 pm
Re: Mitchell Fway PSP - Gribble Rd, Gwelup bypass
Postby wellington_street » Fri Oct 17, 2014 1:15 am
I find it difficult to believe that Main Roads has any real QA system in placeThoglette wrote:It's not the work that takes the time, it's getting QA sign off on the paperwork afterwards.CXCommuter wrote:Still waiting for the opening time- how long does it take to install fences
Can't take the fences down until the certificate of completion is issued.
- CycleSnail
- Posts: 559
- Joined: Thu Feb 26, 2009 1:23 pm
- Location: Bassendean, WA
- Contact:
Re: Mitchell Fway PSP - Gribble Rd, Gwelup bypass
Postby CycleSnail » Thu Oct 23, 2014 12:30 pm
Just letting you know that the new section of PSP, from Erindale-Reid in
Gwelup, will be opened by Main Roads WA tomorrow morning.
Please share this information with your communities.
Regards
Leanne Pitcher
Media & Communications Consultant
- CXCommuter
- Posts: 1885
- Joined: Thu Feb 14, 2013 12:18 pm
- Location: Lane Cove NSW
Re: Mitchell Fway PSP - Gribble Rd, Gwelup bypass
Postby CXCommuter » Thu Oct 23, 2014 3:35 pm
Was worried that the pathway was going to be infested with crickets chirping to themselves amongst the tumbleweedsCycleSnail wrote:Dear cyclists
Just letting you know that the new section of PSP, from Erindale-Reid in
Gwelup, will be opened by Main Roads WA tomorrow morning.
Please share this information with your communities.
Regards
Leanne Pitcher
Media & Communications Consultant
-
- Posts: 298
- Joined: Wed Nov 20, 2013 9:17 pm
Re: Mitchell Fway PSP - Gribble Rd, Gwelup bypass
Postby worzel » Thu Oct 23, 2014 5:46 pm
Woohoo! I wonder what time as I should be heading through there about 7am.CycleSnail wrote:Dear cyclists
Just letting you know that the new section of PSP, from Erindale-Reid in
Gwelup, will be opened by Main Roads WA tomorrow morning.
Please share this information with your communities.
Regards
Leanne Pitcher
Media & Communications Consultant
- rolandp
- Posts: 2316
- Joined: Fri Mar 14, 2008 11:47 am
- Location: Hillarys - Perth, WA
Re: Mitchell Fway PSP - Gribble Rd, Gwelup bypass
Postby rolandp » Fri Oct 24, 2014 12:26 am
12 months later, the bypass is opened.
Should MainRoads be bench marking these types of developments to see if other States/Countries do better, or is this the 'norm'?
Looking forward to riding through at 7am where I hope it will be open. But will be prepared to take Gribble Rd if it is not.
- General Australian Cycling Topics
- Info / announcements
- Buying a bike / parts
- General Cycling Discussion
- The Bike Shed
- Cycling Health
- Cycling Safety and Advocacy
- Women's Cycling
- Bike & Gear Reviews
- Cycling Trade
- Stolen Bikes
- Bicycle FAQs
- The Market Place
- Member to Member Bike and Gear Sales
- Want to Buy, Group Buy, Swap
- My Bikes or Gear Elsewhere
- Serious Biking
- Audax / Randonneuring
- Retro biking
- Commuting
- MTB
- Recumbents
- Fixed Gear/ Single Speed
- Track
- Electric Bicycles
- Cyclocross and Gravel Grinding
- Dragsters / Lowriders / Cruisers
- Children's Bikes
- Cargo Bikes and Utility Cycling
- Road Racing
- Road Biking
- Training
- Time Trial
- Triathlon
- International and National Tours and Events
- Cycle Touring
- Touring Australia
- Touring Overseas
- Touring Bikes and Equipment
- Australia
- Western Australia
- New South Wales
- Queensland
- South Australia
- Victoria
- ACT
- Tasmania
- Northern Territory
- Country & Regional
Who is online
Users browsing this forum: No registered users
- All times are UTC+10:00
- Top
- Delete cookies
About the Australian Cycling Forums
The Australian Cycling Forums is a welcoming community where you can ask questions and talk about the type of bikes and cycling topics you like.
Bicycles Network Australia
Forum Information
Connect with BNA
This website uses affiliate links to retail platforms including ebay, amazon, proviz and ribble.